Menu
Apr 14, 2015

Will a Duty to Inspect the Site Adversely Affect a Differing Site Conditions Claim?

Last month, we discussed why utility contractors should insist on the inclusion of a differing site (changed) conditions (“DSC”) clause in their contracts. A DSC clause allocates to the owner the risk that actual physical conditions at the site are materially different from the expected physical conditions at the site, along with establishing a procedure for adjusting the contract price and time for DSCs.  Absent a properly drafted DSC clause, the doctrine of sanctity of contract normally places the risk on the contractor if the work is more difficult, costly, or time-consuming than expected due to a DSC. DSCs fall… Read more